Hybrid seismic test survey for high resolution mapping of the ground stability for the high speed rail access to Basle; 2 profiles with a total length of 500 m.
Category | Engineering geology |
Country | Germany |
Project period | Apr - May 2003 |
Number of lines | 2 |
Total length (m) | 500 |