Vingnes – Oppland

High resolution hybrid seismic survey for the planned Vingnes A6 motorway by-pass tunnel of Lillehammer; 1 hybrid seismic line of 4’100 m; depth of investigation 200 m

Category Engineering geology
Country Norway
Project period June 2019
Number of lines 1
Total length (m) 4,150
Depth (m) 200