Hybrid seismic investigation of geological subsurfaces for stability risks in new buildings; 6 profiles totalling 950 m.
Category | Engineering geology |
Country | Germany |
Project period | Feb - Mar 2003 |
Number of lines | 6 |
Total length (m) | 950 |
Depth (m) | 50 |
Hybrid seismic investigation of geological subsurfaces for stability risks in new buildings; 6 profiles totalling 950 m.
Category | Engineering geology |
Country | Germany |
Project period | Feb - Mar 2003 |
Number of lines | 6 |
Total length (m) | 950 |
Depth (m) | 50 |