Tiefencastel GR

In the planned area of the power plant Tiefencastel Plus, the basement must be investigated using hybrid seismic. The emphasis is on mapping the surface of the bedrock and the identification of areas of loosening and cracks in the bedrock.

CategoryEngineering geology
CountrySwitzerland
Project periodJun 2012
Number of lines4
Total length (m)200
Depth (m)30