Hybrid seismic characterisation of the rock conditions along the traject of the planned Feuerbach tunnel; 3.5 km long seismic profile in urban Stuttgart.
Category | Engineering geology |
Country | Germany |
Project period | Aug - Sep 2002 |
Number of lines | 1 |
Total length (m) | 3,500 |
Depth (m) | 150 |