High resolution hybrid seismic surveys for mapping the weathering layer thickness and for estimating the bedrock quality for a planned landfill of excavation material of Brenner base tunnel. 8 seismic profiles totalling 4 km length; investigation depth: 100 m.
Category | Engineering geology |
Country | Austria |
Project period | Dec 2009 - Jan 2010 |
Number of lines | 8 |
Total length (m) | 4,000 |
Depth (m) | 100 |