Hybrid seismic geotechnical construction site characterization for a road tunnel connecting the A1 motorway with the city center; one seismic line of 1’400 m, investigation depth 200 m.
Category | Engineering geology |
Country | Switzerland |
Project period | February 2020 |
Number of lines | 1 |
Total length (m) | 1,400 |
Depth (m) | 200 |