St. Gallen SG

Hybrid seismic geotechnical construction site characterization for a road tunnel connecting the A1 motorway with the city center; one seismic line of 1’400 m, investigation depth 200 m.

CategoryEngineering geology
CountrySwitzerland
Project periodFebruary 2020
Number of lines1
Total length (m)1,400
Depth (m)200