Hybrid seismic subsurface investigation on a steep slope for a road by-pass tunnel; 1 profile of 200 m length
Category | Engineering geology |
Country | France |
Project period | Jul - Aug 2000 |
Number of lines | 1 |
Total length (m) | 200 |
Depth (m) | 50 |
Hybrid seismic subsurface investigation on a steep slope for a road by-pass tunnel; 1 profile of 200 m length
Category | Engineering geology |
Country | France |
Project period | Jul - Aug 2000 |
Number of lines | 1 |
Total length (m) | 200 |
Depth (m) | 50 |