Salgesch – Susten

High resolution hybrid seismic mapping of the subsurface structures along a 3 km long portion of the T9 mortorway between Sierre/Siders and Leuk.

CategoryEngineering geology
CountrySwitzerland
Project periodDec 2015
Number of lines42
Total length (m)5,300
Depth (m)100