Øyresvika – Oppland

High resolution hybrid seismic survey for a motorway by-pass tunnel;     7 seismic transects totalling 3’100 m; depth of investigation 200 m

CategoryEngineering geology
CountryNorway
Project periodMarch 2019
Number of lines7
Total length (m)3,100
Depth (m)200