Hybrid seismic investigation around the crater of the collapsed overburden of above a tunnel under construction; 4 high resolution profiles totalling 650 m
Category | Engineering geology |
Country | Switzerland |
Project period | Feb - Mar 2002 |
Number of lines | 4 |
Total length (m) | 650 |