New fast train link Stuttgart-Munich: 14 km of high resolution hybrid seismic surveying for the characterization of the subsurface structures (cavity detection); investigation depth: 50 m.
Category | Engineering geology |
Country | Germany |
Project period | Sep 2014 - Oct. 2015 |
Total length (m) | 14,000 |
Depth (m) | 50 |