Hydroelectrical pumping storage project; Hybrid seismic survey for mapping the subsurface structures for a planned water storage basin; 15 seismic profiles totalling 12 km; investigation depth: 600 m
Category | Environment and Natural Hazards |
Country | Slovenia |
Project period | Aug - Nov 2013 |
Number of lines | 15 |
Total length (m) | 12,000 |
Depth (m) | 600 |