Llogara Pass, tunnel project

Hybrid seismic survey for a major tunnelling project; 1 seismic line in mountaineous terrain of 1700 m with explosives’ seismic source; investigation depth 1200 m.

CategoryEngineering geology
CountryAlbania
Project periodNovember 2020
Number of lines1
Total length (m)1,700
Depth (m)1,200