Gotthard base tunnel; reflection seismic profiling (6 km) for mapping fault zones in the crystalline basement, depth of investigation 800 m
Category | Engineering geology |
Country | Switzerland |
Project period | May 1995 |
Total length (m) | 6,000 |
Depth (m) | 800 |
Gotthard base tunnel; reflection seismic profiling (6 km) for mapping fault zones in the crystalline basement, depth of investigation 800 m
Category | Engineering geology |
Country | Switzerland |
Project period | May 1995 |
Total length (m) | 6,000 |
Depth (m) | 800 |