Leventina, TI

Gotthard base tunnel; reflection seismic profiling (6 km) for mapping fault zones in the crystalline basement, depth of investigation 800 m

CategoryEngineering geology
CountrySwitzerland
Project periodMay 1995
Total length (m)6,000
Depth (m)800