4 reflection seismic profiles probing the subsurface down to 1000 m above the Gotthard base tunnel (9 km total)
Category | Engineering geology |
Country | Switzerland |
Project period | Nov 1994 - Jan 1995 |
Number of lines | 4 |
Total length (m) | 9,000 |
Depth (m) | 1,000 |