Leventina, TI

4 reflection seismic profiles probing the subsurface down to 1000 m above the Gotthard base tunnel (9 km total)

CategoryEngineering geology
CountrySwitzerland
Project periodNov 1994 - Jan 1995
Number of lines4
Total length (m)9,000
Depth (m)1,000