Längental – Kühtai

Hydroelectrical pumping storage project; HR hybrid seismic construction site characterization at the site of a planned dam; investigation depth 150 m; 3 lines totalling 1’240 m

Category Engineering geology
Country Austria
Project period October 2018
Number of lines 3
Total length (m) 1,240
Depth (m) 150