High resolution hybrid seismic mapping of top of bedrock and the geological structures; 3 profiles totalling 450 m.
Category | Hydrogeology and Geothermal Energy |
Country | Switzerland |
Project period | Jun - Jul 2003 |
Number of lines | 3 |
Total length (m) | 450 |
Depth (m) | 100 |