La Chaux-de-Fonds NE

High resolution hybrid seismic survey for the planned road by-pass tunnel “les Arêtes at La Chaux-de-Fonds; 5 seismic lines totalling 1’100 m; depth of investigation 250 m

Category Engineering geology
Country Switzerland
Project period September 2019
Number of lines 5
Total length (m) 1,100
Depth (m) 250