Hybrid seismic survey
Category | Engineering geology |
Country | Russia |
Project period | Jul - Aug 2010 |
Number of lines | 12 |
Total length (m) | 8,000 |
Depth (m) | 100 |
Hybrid seismic survey
Category | Engineering geology |
Country | Russia |
Project period | Jul - Aug 2010 |
Number of lines | 12 |
Total length (m) | 8,000 |
Depth (m) | 100 |