Category | Engineering geology |
Country | Austria |
Project period | Sep 2013 |
Number of lines | 5 |
Total length (m) | 5,300 |
Depth (m) | 200 |
Category | Engineering geology |
Country | Austria |
Project period | Sep 2013 |
Number of lines | 5 |
Total length (m) | 5,300 |
Depth (m) | 200 |