Hybrid seismic survey for a hydrogeological study in the context of a planned oil pipe line; 11 seismic lines totalling 10 km; investigation depth 150 m
Category | Engineering geology |
Country | Uganda |
Project period | January 2019 |
Number of lines | 11 |
Total length (m) | 10,000 |
Depth (m) | 150 |