Giubiasco / Ceneri pass

Hybrid and MASW seismic assessment of the ground stability along the N2 national motorway; 9 profiles totalling 3.5 km, investigation depth: 200 m

CategoryEngineering geology
CountrySwitzerland
Project periodMay 2014
Number of lines9
Total length (m)3,500
Depth (m)200