Ultra-high resolution hybrid seismic assessment of the rock quality for a cycle path/pedestrian sidewalk enlargement of the main road Quartino – Magadino; 4 seismic lines totalling 620 m; depth of investigation 15 m
Category | Engineering geology |
Country | Switzerland |
Project period | July 2019 |
Number of lines | 4 |
Total length (m) | 640 |
Depth (m) | 20 |