Eschenlohe, Bavaria

High resolution hybrid seismic mapping of the bedrock surface at the southern portal region of the Auerberg road tunnel; 11 lines totalling 980 m, investigation depth 50 m

CategoryEngineering geology
CountryGermany
Project periodMarch - April 2021
Number of lines11
Total length (m)980
Depth (m)50