Eisten VS

High resolution hybrid seismic mapping of the bedrock surface for the planned Deibfels road tunnel; 3 lines totalling 480 m, investigation depth 70 m

CategoryEngineering geology
CountrySwitzerland
Project periodMarch 2021
Number of lines3
Total length (m)480
Depth (m)100