Court BE

Hybrid seismic characterisation of the subsurface along the A16 Transjurane motorway by-pass tunnel at Court; 4 seismic profiles totalling 1.3 km

CategoryEngineering geology
CountrySwitzerland
Project periodNov - Dec 2006
Number of lines4
Total length (m)1,300