High resolution hybrid seismic mapping of the bedrock surface for the construction of a road tunnel in central Rabat; 19 profiles totalling 3´000 m; depth of investigation 100 m
Category | Engineering geology |
Country | Morocco |
Project period | Sep - Okt 2005 |
Number of lines | 19 |
Total length (m) | 3,000 |
Depth (m) | 100 |