City of Lucerne

High resolution hybrid seismic mapping of the bedrock surface and overburden structures for the construction of a railway tunnel in central Lucerne; 5 profiles totalling 700 m; depth of investigation 30 m.

CategoryEngineering geology
CountrySwitzerland
Project periodApr - May 2011
Number of lines5
Total length (m)700
Depth (m)30