City of Lucerne

High resolution hybrid seismic mapping of the bedrock surface and overburden structures for the construction of a railway tunnel in central Lucerne; 3 profiles totalling 1800 m; depth of investigation 50 m.

CategoryEngineering geology
CountrySwitzerland
Project periodJul 2010
Number of lines3
Total length (m)1,800
Depth (m)50