High resolution hybrid seismic mapping of the bedrock surface and overburden structures for the construction of a railway tunnel in central Lucerne; 3 profiles totalling 1800 m; depth of investigation 50 m.
Category | Engineering geology |
Country | Switzerland |
Project period | Jul 2010 |
Number of lines | 3 |
Total length (m) | 1,800 |
Depth (m) | 50 |