City of Lucerne

High resolution hybrid seismic mapping of the bedrock surface and overburden structures for the construction of a railway tunnel in central Lucerne; 5 profiles totalling 400 m; depth of investigation 100 m.

CategoryEngineering geology
CountrySwitzerland
Project periodJan - Feb 2007
Number of lines5
Total length (m)400
Depth (m)100