City of Lucerne

High resolution hybrid seismic mapping of the bedrock surface and overburden structures for the construction of a motorway by-pass tunnel in central Lucerne; 7 profiles totalling 1100 m; depth of investigation 100 m

CategoryEngineering geology
CountrySwitzerland
Project periodMar - Apr 2006
Number of lines7
Total length (m)1,100
Depth (m)100