City of Lucerne

High resolution hybrid seismic mapping of the bedrock surface and overburden structures for the construction of a railway tunnel in central Lucerne; 6 profiles totalling 650 m; depth of investigation 100 m

CategoryEngineering geology
CountrySwitzerland
Project periodMar - Apr 2006
Number of lines6
Total length (m)650
Depth (m)100