Chiggiogna TI

Refraction seismic mapping of the bedrock surface in the abandoned Chiggiogna quarry designed as a deposition pit for excavation material of the future Gotthard base tunnel; 7 profiles totalling 1.5 km)

CategoryEngineering geology
CountrySwitzerland
Project periodSep 1997
Number of lines7
Total length (m)1,500