High resolution hybrid seismic surveying in the context of a water gallery under construction, investigation depth: 300 m
Category | Engineering geology |
Country | Italy |
Project period | January - May 2017 |
Number of lines | 12 |
Total length (m) | 7,500 |
Depth (m) | 300 |