Hi-res hybrid seismic investigation of the subsurface for an avalanche deviation dam; 5 profiles totalling 750 m
Category | Engineering geology |
Country | Switzerland |
Project period | Sep - Nov 2003 |
Number of lines | 5 |
Total length (m) | 750 |
Hi-res hybrid seismic investigation of the subsurface for an avalanche deviation dam; 5 profiles totalling 750 m
Category | Engineering geology |
Country | Switzerland |
Project period | Sep - Nov 2003 |
Number of lines | 5 |
Total length (m) | 750 |