A16 Transjurane, Tunnel de neu-Bois

High resolution seismic mapping along a planned motorway tunnel in a karst environment; 5 profiles totalling 1900 m, investigation depth 150 m.

CategoryEngineering geology
CountrySwitzerland
Project periodFeb 2007
Number of lines7
Total length (m)1,900
Depth (m)150