Wängital, Bürglen UR

High resolution seismic survey for a feasability study for a planned hydropower plant. Targets: separation of moraine and talus sediments, mapping of bedrock’s surface, characterization of bedrock. 3 hybrid seismic profiles, totalling 750 m in very steep environment, depth of investigation 100 m.

CategoryIngenieurgeologie
CountrySwitzerland
Project periodAug - Sep 2010
Number of lines3
Total length (m)700
Depth (m)100