Roveredo GR

Hi-res hybrid seismic survey for the delineation of the crystalline bedrock surface along a planned motorway by-pass tunnel at Roveredo; 4 profiles totalling 2 km; depth of investigation 150 m

CategoryIngenieurgeologie
CountrySwitzerland
Project periodApr 2004
Number of lines4
Total length (m)2.000
Depth (m)150