High resolution hybrid seismic mapping of the bedrock surface and overburden structures for the construction of a road tunnel in an alpine valley; 4 profiles totalling 400 m; depth of investigation 30 m.
Category | Ingenieurgeologie |
Country | Switzerland |
Project period | Mar 2009 |
Number of lines | 4 |
Total length (m) | 400 |
Depth (m) | 30 |