Tunnel de Chavanne

High resolution hybrid seismic investigation along the planned tunnel of Chavanne, high speed train link Rhin – Rhône; 1 profile of 1200 m; investigation depth 120 m.

Category Engineering geology
Country France
Project period Mar - Apr 2004
Number of lines 1
Total length (m) 1,200
Depth (m) 120