Stuttgart Feuerbachtunnel

Hybrid seismic characterisation of the rock conditions along the traject of the planned Feuerbach tunnel; 3.5 km long seismic profile in urban Stuttgart.

Category Engineering geology
Country Germany
Project period Aug - Sep 2002
Number of lines 1
Total length (m) 3,500
Depth (m) 150