Steinach a. Brenner, Tyrolia

High resolution hybrid seismic surveys for mapping the weathering layer thickness and for estimating the bedrock quality for a planned landfill of excavation material of Brenner base tunnel. 8 seismic profiles totalling 4 km length; investigation depth: 100 m.

Category Engineering geology
Country Austria
Project period Dec 2009 - Jan 2010
Number of lines 8
Total length (m) 4,000
Depth (m) 100