Roveredo GR

Hi-res hybrid seismic survey for the delineation of the crystalline bedrock surface along a planned motorway by-pass tunnel at Roveredo; 4 profiles totalling 2 km; depth of investigation 150 m

Category Engineering geology
Country Switzerland
Project period Apr 2004
Number of lines 4
Total length (m) 2,000
Depth (m) 150