Merklingen – Ulm

New fast train link Stuttgart-Munich: 14 km of high resolution hybrid seismic surveying for the characterization of the subsurface structures (cavity detection); investigation depth: 50 m.

Category Engineering geology
Country Germany
Project period Sep 2014 - Oct. 2015
Total length (m) 14,000
Depth (m) 50