Guttannen BE

Hybrid seismic mapping of the bedrock surface and valley infill structures for the construction of an underground gas pipeline in the Swiss Alps; 4 profiles totalling 4.5 km; investigation depth 600 m.

Category Engineering geology
Country Switzerland
Project period Aug - Sep 2013
Number of lines 4
Total length (m) 4,500
Depth (m) 600