Court BE

Hybrid seismic characterisation of the subsurface along the A16 Transjurane motorway by-pass tunnel at Court; 4 seismic profiles totalling 1.3 km

Category Engineering geology
Country Switzerland
Project period Nov - Dec 2006
Number of lines 4
Total length (m) 1,300