A-9 Tunnel of Riedberg, Steg/Gampel VS

High resolution seismic mapping along a planned motorway tunnel across an instable slope; 5 profiles totalling 1500 m, investigation depth 150 m

Category Engineering geology
Country Switzerland
Project period Mar - Apr 2006
Number of lines 5
Total length (m) 1,500
Depth (m) 150